The Challenge

A major industrial facility operator in the Gulf region required a fully integrated fire and life safety system design for a new 45,000 m² manufacturing campus. The project involved coordinating FLS design across multiple building occupancy types under NFPA 101, IBC, and local authority regulations.

Our Solution

Metamorph’s FLS engineering team led the end-to-end safety system design, including fire suppression, detection and alarm, emergency egress, and a site-wide integrated safety management system. We coordinated with the structural, MEP, and civil teams throughout the design stages and managed the AHJ approval process.

Results