The Challenge
A major industrial facility operator in the Gulf region required a fully integrated fire and life safety system design for a new 45,000 m² manufacturing campus. The project involved coordinating FLS design across multiple building occupancy types under NFPA 101, IBC, and local authority regulations.
Our Solution
Metamorph’s FLS engineering team led the end-to-end safety system design, including fire suppression, detection and alarm, emergency egress, and a site-wide integrated safety management system. We coordinated with the structural, MEP, and civil teams throughout the design stages and managed the AHJ approval process.
Results
- AHJ approval secured first submission — no resubmissions required
- Integrated system design reduced estimated maintenance costs by 18%
- Project delivered on schedule, enabling a 3-month early operational launch
- Zero safety incidents during construction phase